Ask Copilot
Section · km 13.2–16.0

NC-05 Kelso Cutting – Harbour Road

2 open observations. Last inspected 22 Sep 2026, next due 21 Nov 2026.

Condition score

Attention
81 /100 · 82 on 26 Aug
Rail
84
Sleepers
83
Fasteners
79
OBS-1045 fastener deterioration · confirmed · −1.5
Ballast
77
OBS-1044 ballast contamination · pending, half weight · −3.0
Vegetation
82

Internal Ralliyo metric, not a regulatory rating. Open observations deduct points by priority (high 12, medium 6, low 3), scaled by severity; pending observations count at half weight.

AssetCategoryKmConditionOpen
FS-NC05-089-RFastener14.086—
FS-NC05-090-LFastener14.386—
FS-NC05-088-LFastener13.888—
FS-NC05-091-RFastener14.689—
FS-NC05-093-RFastener15.289—
RL-NC05-002Rail13.290—
SL-NC05-208Sleeper14.690—
SL-NC05-210Sleeper15.190—
FS-NC05-089-LFastener14.090—
SL-NC05-205Sleeper13.991—
SL-NC05-207Sleeper14.492—
FS-NC05-092-RFastener14.992—
BZ-NC05-01Ballast zone13.992—
VG-NC05-02Vegetation zone15.493—
SL-NC05-209Sleeper14.994—
SL-NC05-211Sleeper15.494—
RL-NC05-001Rail13.295—
SL-NC05-204Sleeper13.695—
SL-NC05-206Sleeper14.195—
FS-NC05-088-RFastener13.895—
FS-NC05-090-RFastener14.395—
FS-NC05-093-LFastener15.295—
VG-NC05-01Vegetation zone14.095—
FS-NC05-091-LFastener14.6961
FS-NC05-092-LFastener14.996—
BZ-NC05-02Ballast zone15.2961

Inspection history

InspectionSectionDateMethodImagesObservationsInspector
INS-2026-039NC-0522 Sep 2026Drone survey · nadir imagery42S. Varga

Maintenance

No maintenance items.