Section · km 3.5–7.0
WC-02 Millbrook – Orton
1 open observations. Last inspected 30 Jul 2026, next due 28 Sep 2026.
Condition score
Normal90 /100 · 90 on 26 Aug
Rail
92
Sleepers
91
Fasteners
86
OBS-1021 fastener deterioration · confirmed · −1.5
Ballast
91
Vegetation
90
Internal Ralliyo metric, not a regulatory rating. Open observations deduct points by priority (high 12, medium 6, low 3), scaled by severity; pending observations count at half weight.
Open observations
1Fastener deterioration
OBS-1021FS-WC02-032-LWC-02New
Low76%
Condition trend
Assets
| Asset | Category | Km | Condition | Open |
|---|---|---|---|---|
| SL-WC02-091 | Sleeper | 6.2 | 86 | — |
| FS-WC02-034-L | Fastener | 5.6 | 86 | — |
| FS-WC02-035-R | Fastener | 6.0 | 86 | — |
| VG-WC02-01 | Vegetation zone | 4.5 | 86 | — |
| SL-WC02-084 | Sleeper | 4.0 | 87 | — |
| SL-WC02-088 | Sleeper | 5.3 | 88 | — |
| FS-WC02-032-R | Fastener | 4.9 | 88 | — |
| SL-WC02-085 | Sleeper | 4.3 | 89 | — |
| SL-WC02-090 | Sleeper | 5.9 | 89 | — |
| BZ-WC02-01 | Ballast zone | 4.4 | 89 | — |
| BZ-WC02-02 | Ballast zone | 6.0 | 89 | — |
| RL-WC02-002 | Rail | 3.5 | 90 | — |
| SL-WC02-089 | Sleeper | 5.6 | 91 | — |
| FS-WC02-032-L | Fastener | 4.9 | 91 | 1 |
| SL-WC02-087 | Sleeper | 5.0 | 92 | — |
| FS-WC02-033-R | Fastener | 5.3 | 92 | — |
| RL-WC02-001 | Rail | 3.5 | 93 | — |
| FS-WC02-030-L | Fastener | 4.2 | 93 | — |
| FS-WC02-031-L | Fastener | 4.5 | 94 | — |
| FS-WC02-035-L | Fastener | 6.0 | 94 | — |
| SL-WC02-086 | Sleeper | 4.7 | 95 | — |
| FS-WC02-031-R | Fastener | 4.5 | 95 | — |
| FS-WC02-033-L | Fastener | 5.3 | 95 | — |
| FS-WC02-034-R | Fastener | 5.6 | 95 | — |
| VG-WC02-02 | Vegetation zone | 6.2 | 95 | — |
| FS-WC02-030-R | Fastener | 4.2 | 96 | — |
Inspection history
| Inspection | Section | Date | Method | Images | Observations | Inspector |
|---|---|---|---|---|---|---|
| INS-2026-019 | WC-02 | 30 Jul 2026 | Track walk · smartphone imagery | 3 | 1 | L. Brandt |
Maintenance
No maintenance items.